
We have stopped supporting IE6. Switch to FireFox, Safari or Internet Explorer 7. We love web standards close
You’ve made your smart living choice with DMCI Homes. Now, allow us to guide you through the process and requirements to make sure your choice becomes truly yours.
The turnover process is the most important procedure to a new
homeowner, because this is when the property finally changes hands.
Because we know how important this is to you, we'd like to share some
guidelines to make the transition smooth and satisfactory for everyone.
a.1: Receiving the Clearance for Turnover
Once the Documentation Group give s a Clearance for Turnover, our
Turnover Group will arrange your schedule for unit inspection. It takes
about 30 days from the date of clearance was issued.
a.2 : WEEK 1 to WEEK 2 (from receipt of clearance) – For Condo and House and Lot
For Lots Only
Once your schedule for turnover has been arranged, you will be asked to
inspect the area and our Turnover Group representative will introduce
you to the Property Manager for briefing, orientation regarding
policies, rules, and regulations.
a.3. WEEK 3 (From receipt of clearance) – For Condo and House and Lot
The Turnover Group will conduct an initial inspection of your unit,
together with a representative from the Design & Construction
Group. This is usually done on the 20th day from receipt of clearance.
There will be a 5 – 6 day rectification period after the initial inspection/ punch listing.
a.4. WEEK 4 (From receipt of clearance)
For Condo Only
You will be informed of your schedule for unit inspection. This is
usually done on the 26th day of the clearance date. You will also be
informed of your payment obligations such as:
• Meralco Service
• Real Property Tax of Common Areas and Land
• Temporary Power Bill Deposit
• Joining Fee for Condo Corp
• Association Dues
a.5: On the 30th Day from Receipt of Clearance, you will inspect, together with the turnover group your actual unit.
a.5.a. If you are satisfied with your unit’s condition and its punch listed items, the unit will be immediately turned over to you.
a.5.b. Upon turnover of your unit, you will be introduced to the Property Manager for Briefing and Orientation as regards to condo policies, rules
and regulations. You will also be given your Homeowners Manual, wherein
you can familiarize yourself with the property’s features, amenities
and PMO services.
a.5.c. At this point you will also be asked to issue check/cash
payment for Meralco Service Deposit, Joining Fee and Real Property Tax.
a.5.d. Upon signing the Certificate of Acceptance and Authority to
turnover (Clearance), you will be given the turnover kit and the
complete set of keys for your unit.
If
you fail to inspect and accept the unit within thirty (30) days from
the date of notice that the unit is ready for turnover, it shall be
deemed that the buyer has automatically accepted the unit.
a.5.e. Acceptance by a Representative
If the registered buyer is
not available on the scheduled turnover of unit, his/her duly
authorized representative can accept the unit in his/her behalf. The
representative must be designated as the duly appointed Special Power
of Attorney (SPA) representative.
The unit turnover cannot be delayed on account of SPA’s availablity schedule.
A.6: WEEK 5 (From Receipt of Clearance) – For Condo and House and Lot
If you feel that there are still some rectifications to be done to your
unit, another inspection and punch listing will be rescheduled. You
will be informed of the rescheduled inspection and punch listing during
Week 5 from date of receipt of clearance.
Warranty: Your unit is backed by a 2-year warranty, excluding repairs
of items affected by normal wear and tear, misuse or termite
infestation.
Upgrades, improvements and other personal modifications to your unit
may only be allowed after the official acceptance. Please bear in mind
that certain warranties may be voided by alterations.
Notice of acceptance letter released by Turnover Group once clearance
was with them in able to inform our client that their unit is ready for
inspection / punchlist.